U-VALUE CALCULATOR

VERSION 1.5.4

Step 3. Construction build-up for calculations

TLX Gold taut with insulation between but exposed rafters

Roof tiles and battens
25mm Ventilated airspace
Unventilated airspace between rafters (minimum 10mm)

© Copyright 2026 Pauley Creative Ltd. All Rights Reserved.